match drilling – PH-MNX http://ph-mnx.nl Building and Flying my π in the Sky Wed, 27 Jun 2018 18:59:46 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.6 http://ph-mnx.nl/wp-content/uploads/sites/7/2023/01/cropped-maverick_150-32x32.png match drilling – PH-MNX http://ph-mnx.nl 32 32 Left Skin Match Drill http://ph-mnx.nl/2018/06/27/left-skin-match-drill/ http://ph-mnx.nl/2018/06/27/left-skin-match-drill/#respond Wed, 27 Jun 2018 18:59:46 +0000 http://ph-mnx.nl/?p=1105 Almost identical work as the previous post, but this time the Left Wing. Clecoing the Wing Walk Doubler, the top inboard skin and top outboard skin to the Left Wing.

And start match drilling!

The top side all match drilled.

Now the bottom side, which you can recognize at the three access holes.

And when everything is done, you end with an empty spar again. Although now I read through it again and it says, let the top skin clecoed, to fit the Leading edge skin.

Time: 4 Hours, Rivets: 0/0

Video

]]>
http://ph-mnx.nl/2018/06/27/left-skin-match-drill/feed/ 0
Vertical Stabilizer Match-Drilling http://ph-mnx.nl/2017/10/22/vertical-stabilizer-match-drilling/ http://ph-mnx.nl/2017/10/22/vertical-stabilizer-match-drilling/#respond Sun, 22 Oct 2017 17:40:52 +0000 http://mnemonics.nl/rv7/?p=515 The vertical stabilizer is much less work (and in my opinion much easier) than the horizontal stabilizer. Which begs the question, “why don’t the plans start with the vertical stabilizer”. Anyway, together with my dad we started with the vertical stabilizer. Fitting and cleco-ing all the pieces together went very fast.

With two persons the assembly and match-drilling is easy. When everything is drilled, we dissembled the vertical stabilizer again and while I was dimpling the skin, my dad did all the deburring and edge cleaning.

The bottom part of the vertical stabilizer’s rear spar needs to be flush. Again we could parallelize the jobs, mhile I was counter sinking the rear spar doubler, my dad was dimpling the rear spar.

We’ve done all the match-drilling and dimpling in just 4 hours. Next time I can prime all the parts and then final assembly of the vertical stabilizer.

Time: 4 Hours, Rivets: 0

Video

]]>
http://ph-mnx.nl/2017/10/22/vertical-stabilizer-match-drilling/feed/ 0