Spray Booth – PH-MNX http://ph-mnx.nl Building and Flying my π in the Sky Wed, 20 Sep 2017 20:43:38 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.6 http://ph-mnx.nl/wp-content/uploads/sites/7/2023/01/cropped-maverick_150-32x32.png Spray Booth – PH-MNX http://ph-mnx.nl 32 32 Training project 2 http://ph-mnx.nl/2017/09/20/training-project-2/ http://ph-mnx.nl/2017/09/20/training-project-2/#respond Wed, 20 Sep 2017 20:43:38 +0000 http://marcelheijmans.net/rv7/?p=225 The second part of the RV Training project consists of building a short section of control surface. The plans mentioned using the 12″ drill, however since the control surface itself is small a misunderstood it as a #12 drill. Since that hole needs a AN4126AD3-4 rivet, there is no way I’m going to use the #12. After reading it for the fifth time finally my brain saw the 12″ instead of the #12.

I’ve got everything assembled, match drilled, partly dimpled and scuffed ready for priming. I want to see the results of dimpling before priming and dimpling after priming.

Speaking of priming, today I also created a spray booth.

Video

]]>
http://ph-mnx.nl/2017/09/20/training-project-2/feed/ 0