Training project 2

The second part of the RV Training project consists of building a short section of control surface. The plans mentioned using the 12″ drill, however since the control surface itself is small a misunderstood it as a #12 drill. Since that hole needs a AN4126AD3-4 rivet, there is no way I’m going to use the #12. After reading it for the fifth time finally my brain saw the 12″ instead of the #12.

I’ve got everything assembled, match drilled, partly dimpled and scuffed ready for priming. I want to see the results of dimpling before priming and dimpling after priming.

Speaking of priming, today I also created a spray booth.

Video

Leave a Reply

Your email address will not be published. Required fields are marked *